D01_710503BBACPC011 - Corografia generale di inquadramento

Submitted by admin on Wed, 05/04/2022 - 11:15
  • Read more about D01_710503BBACPC011 - Corografia generale di inquadramento

D02_710503BBACPC022 - Planimetria stato di fatto e coordinamento sottoservizi

Submitted by admin on Wed, 05/04/2022 - 11:15
  • Read more about D02_710503BBACPC022 - Planimetria stato di fatto e coordinamento sottoservizi

D03_710503BBACPP013 - Planimetria di progetto

Submitted by admin on Wed, 05/04/2022 - 11:15
  • Read more about D03_710503BBACPP013 - Planimetria di progetto

D04_710503BBACPZ013 - Sezioni di progetto

Submitted by admin on Wed, 05/04/2022 - 11:14
  • Read more about D04_710503BBACPZ013 - Sezioni di progetto

D05_710503BBACP0013 - Impianto di sollevamento-carpenteria tav. 1-4

Submitted by admin on Wed, 05/04/2022 - 11:14
  • Read more about D05_710503BBACP0013 - Impianto di sollevamento-carpenteria tav. 1-4

D06_710503BBACP0023 - Impianto di sollevamento-carpenteria tav. 2-4

Submitted by admin on Wed, 05/04/2022 - 11:13
  • Read more about D06_710503BBACP0023 - Impianto di sollevamento-carpenteria tav. 2-4

D07_710503BBACP0033 - Impianto di sollevamento-carpenteria tav. 3-4

Submitted by admin on Wed, 05/04/2022 - 11:12
  • Read more about D07_710503BBACP0033 - Impianto di sollevamento-carpenteria tav. 3-4

D08_710503BBACP0042 - Impianto di sollevamento-carpenteria tav. 4-4

Submitted by admin on Wed, 05/04/2022 - 11:12
  • Read more about D08_710503BBACP0042 - Impianto di sollevamento-carpenteria tav. 4-4

D09_710503BBACP0052 - Impianto di sollevamento-armatura tav.1-8

Submitted by admin on Wed, 05/04/2022 - 11:11
  • Read more about D09_710503BBACP0052 - Impianto di sollevamento-armatura tav.1-8

D10_710503BBACP0062 - Impianto di sollevamento-armatura tav.2-8

Submitted by admin on Wed, 05/04/2022 - 11:10
  • Read more about D10_710503BBACP0062 - Impianto di sollevamento-armatura tav.2-8
  • Pagina precedente
  • 42
  • Pagina successiva
i.d.l. baciacavallo i.d.l. calice Bisenzio Valley 
Image
valbisenzio
Bisenzio Valley
Depuration Plants of Val Bisenzio

With a process that began in 1997, the depuration plants of the municipalities of Vaiano, Vernio and Cantagallo also became part of the system: they're all characterized by being located along the Bisenzio river and by treating discharges mainly originating from the textile industry. Also for these plants, the Company has provided, where necessary, structural adjustments.

Sewage Depuration Plant in Vaiano

The sewage depuration plant of Vaiano (30,000 P.E.), treats an average of 8,000 cubic meters/day on weekdays, reducing about 4,000 kg/day of COD and little less than 150 kg/day of surfactants. It basically consists of equalization, denitrification, biological oxidation, secondary sedimentation and final ozonation.
The sludge line consists of gravity thickening, aerobic digestion and mechanical dewatering with centrifuge. The sludge resulting from the purification process amounts to about 2,000 t/year at 18% of D.M.

Sewage Depuration Plant in Vernio 

The sewage treatment plant of Vernio (30,000 P.E.), on weekdays, treats an average of 7,000 cubic meters/day, reducing about 4,000 kg/day of COD and little less than 100 kg/day of surfactants. It basically consists of equalization, biological oxidation and secondary sedimentation. It is also planned to install a final filtration section for the reduction of suspended solids. The sludge line consists of gravity thickening, aerobic digestion and mechanical dewatering with belt press. The sludge resulting from the purification process amounts to about 1,500 t/year at 20% of D.M.

Sewage Depuration Plant in Cantagallo

The sewage treatment plant of Cantagallo (35,000 P.E.), on weekdays, treats an average of 10,000 cubic meters/day, reducing about 4,000 kg/day of COD and just under 100 kg/day of surfactants. Basically, it consists of equalization, denitrification, biological oxidation, secondary sedimentation. The peculiarity of this plant is to be completely covered. It is also planned to install a final section followed by ozonation for the reduction of color. The sludge line consists of gravity thickening, aerobic digestion and mechanical dewatering with centrifuge. The sludge resulting from the purification process amounts to about 1,500 t/y at 20% of D.M.

 

Image
calice
I.D.L. Calice

The second largest depuration plant in Prato is Calice which was started in 1985 and is located in the western part of the municipality, on the border with the Municipality of Agliana. The plant was structurally adapted in 2000 and almost doubled in 2002.
The sewage drained in the west of the city and those coming from the nearby Municipality of Montemurlo converge treatment plant of Prato-Calice (190,000 P.E.).

The Calice depuration plant, on weekdays can treat up to 39,000 cubic meters/day and can break down up to 20,000 kg/day of COD and 1100 kg/day of surfactants. Basically it consists of equalization, primary sedimentation, denitrification, biological oxidation, secondary sedimentation, clear final flocculation, sand filters and ozonation. The sludge line consists of gravity thickening, mechanical dewatering with centrifuge and filter press. The resulting sludge from the purification process can amount up to 10,000 t/year with a variable humidity between 64 and 74%.

 

Image
baciacavallo
I.D.L. Baciacavallo

The centerpiece of the centralized depuration system is Baciacavallo purification plant, located in the south-east of the city, near the border with the Municipality of Poggio a Caiano. The previously existing millponds Mazzoni, Bresci and Romita together with the pressurised collectors that drain the two new industrial areas (macrolotti) converge on it. The first core of the plant dates back to 1980.
In 1986 the treatment line was almost doubled.
In 1992 the ozonation plant was built for the removal of surfactants and color. In 1999 the tertiary treatment of clariflocculation was doubled and at the same time the dewatering section of the residual sludge was strengthened and modernized.

On weekdays, the plant can treat up to 130,000 cubic meters/day, reducing up to 100,000 kg/day of COD and 4,500 kg/day of surfactants. Basically it consists of equalization, primary sedimentation, biological oxidation, secondary sedimentation, clariflocculation and final refinement with ozone, for the reduction of color and residual surfactants. The sludge line consists of gravity thickening, mechanical dewatering with centrifuges and sludge incineration.
The latter section includes a 100 t/day multistorey incinerator, equipped with post-combustion, gas treatment train, filter bags and continuous emission analyser. The production of sludge resulting from the purification process can reach 30,000 t/year at 75% humidity.

 

Solar energy produced Dashboard

  • Daily Usage2860.0 KWh
  • CO2 Avoided 1076.0 Ton
  • T.E.P. 175.4

Total 1996.0 MWh

 
 

 

 

logo
  • Gestione Impianti Depurazione Acque
  • Via Baciacavallo, 36 - 59100 Prato
  • Tel +39 0574 646511
  • Fax +39 0574 542530
  • Email [email protected]
  • Email Certified: [email protected]
  • P. IVA 00289380974
  • C.F. 03122430485 R.E.A. PO 302659
  • Registration number in the Business Register of Prato e C.F 7491
  • Cap. Soc. euro 4.620.000,00 i.v.
  • Company subject to management and coordination by Alia Servizi Ambientali Spa
  • Privacy Policy | Cookie Policy
  • Whistleblowing

Footer menu

About us

Contact

Depuration

Education and research

Retrieval

Treatment

Info Gdpr

MOG 231-01

Albo fornitori

Work with us

Società trasparente

Faq

Image
kiwa14001
Image
kiwa9001
Image
logo emas

Certifications

Authorizations

Regulations

Search